02/1999 Roadblock. It is said that demolition charges were placed in holes in the abutments at both ends of the bridge. These are more likely to have been sockets for a vertical rail roadblock at each end of the bridge. Charges are more likely to be placed below the arches of the bridge
Anti Tank Vertical Rail
- · Added by @bunkeratlas
Other
Unknown
Removed
Gallery
No photos yet for this location.
Description
This research is automated and may contain errors.
Location on Map
Nearby Locations
Data Sheet
Embeddable Map
Is this location still here?
Help keep the map accurate by voting if this location still exists or has been destroyed.